PROJECT DELIVERY
The building process is exciting—but very complex. It takes considerable skill and attention to advance a project from a gleam in a client’s eye to a fully designed and constructed facility ready for a lifetime of cherished use. Specifically, it requires detailed planning and design services; well managed budgeting, purchasing, and organization of high-end materials; contractual outlines of duties and responsibilities; and effective management throughout the ever-evolving project landscape.
To meet the needs of a variety of clients and scenarios, McQueenVerdi ▪ Group offers three tailored and industry-recognized options for project delivery:
▪ Design / Build
▪ Design – Bid – Build
▪ Construction Management
PROJECT DELIVERY METHODS
DESIGN / BUILD
The Design / Build method is perhaps the most common and straightforward of delivery options—and the one that best avoids many of the inherent difficulties common in traditional three-party approaches that utilize separate parties for both design and construction.
Simply put, it’s an option focused on integration. The client awards a single contract for the complete design, management, and construction of a project, dealing with a single source in order to save time and money while avoiding the unnecessary risks and complexities that often accompany multi-party contracts.
Design / Build Summary: |
|
| ▪ | Two Prime Parties: Owner + Designer / Builder |
| ▪ | One Contract |
| ▪ | Competitively Bid (most often via lump sum construction contracts) |
| ▪ | Selection Based on the Best Qualified Candidate |
Design / Build Attributes: |
|
| ▪ | Centralized Responsibility, Communication, and Accountability |
| ▪ | Predetermined, Guaranteed, and Reduced Construction Costs |
| ▪ | Reduced Risk |
| ▪ | Optimized Schedule |
| ▪ | Increased Efficiency of Design Process |
| ▪ | Minimized Change Orders and Delays |
| ▪ | Avoidance of Conflict |
| ▪ | Client Retains Maximum Control |
| ▪ | Open to Client Preferred Subcontractors For Trade Work |
Design / Build Challenges: |
|
| ▪ | Demanding Interview Process |
| ▪ | Selection Based on Price Alone can lead to Inferior Quality |
| ▪ | Client Must Select a Provider Skilled in All Aspects of the Project |
| ▪ | Client Must Make Early and Timely Decisions |
| ▪ | Beginning of Process is More Intensive |
DESIGN – BID – BUILD
The Design – Bid – Build method transfers responsibility mid-project, adding an additional party upon the architect’s completion of design. The client contracts an architect to design the project and develop all requisite documentation, then uses this work to procure a selection of construction bids from outside parties. Once a selection has been made, the client retains the original architect to administer the contract.
| Design – Bid – Build Summary: | |
| ▪ | Three Prime Parties: Owner + Architect + Builder |
| ▪ | Two Separate Contracts |
| ▪ | Competitively Bid (most often via lump sum construction contracts) |
| ▪ | Constructing Contractor Selection Based on Lowest Responsible Bid |
| Design – Bid – Build Attributes: | |
| ▪ | Open to Client-Preferred Subcontractors for Trade Work |
| ▪ | Client Assumes Less Responsibility |
| ▪ | Reduced Risk |
| ▪ | Guaranteed Cost and Schedule |
| Design – Bid – Build Challenges: | |
| ▪ | Compromised Ability to Qualify Client-Preferred Subcontractors |
| ▪ | Client Retains Significantly Less Control |
| ▪ | Extended Interview Process for Subcontractors |
| ▪ | Change Orders Threaten Productivity |
CONSTRUCTION MANAGEMENT
The Construction Management method utilizes a construction manager to facilitate the design and construction of a project by organizing the requisite parties, materials, and equipment. A construction manager at risk (CMc) takes on more complex responsibilities by overseeing the specific means and methods of construction, while a construction manager Not At - Risk (CM) serves the simplified role of an owner’s representative and advisor.
| Construction Management Summary: | |
| ▪ | Three Primary Parties: Owner + Architect + Construction Manager |
| ▪ | Multiple Contracts |
| ▪ | Price Usually Held to a Maximum Range |
| Construction Management Attributes: | |
| ▪ | Construction Manager will Qualify Subcontractors |
| ▪ | Owner Retains Significant Involvement and Control |
| ▪ | Minimizes Contractor Change Orders |
| ▪ | Guarantees Cost, Schedule, and Value |
| Construction Management Challenges: | |
| ▪ | Price may not be most Competitive |
| ▪ | Use of Owner’s Preferred Contractors may add Exposure |
| ▪ | Change Orders may Threaten Productivity |